Quote Originally Posted by lotto009
According to my opinion



UL power congesstion can increased
Verify to increase ENU& careful RTWP
Verify to decrease HSUPA user no.
Control coverage cariful SHO margin enough?
DL power congesstion
Increase Power Resource(refer power RRU careful power alarm mismatch)
CPICH Power decreased 1db step
Optimize Load reshuffle
New coverage
can infromation more
* alot